Point Loma ADU project by Builders Now

// accessory dwelling units

Unlock your property's potential with a custom ADU.

Turn underused space into a beautiful, functional unit, designed and built for San Diego homeowners.

// why an adu

Why add an ADU to your property?

  • Added Value

    Boost your property's market worth.

  • Income Stream

    Earn passive rental income.

  • Flexible Usage

    Guest house, office, rental: you decide.

  • Smart Investment

    Secure your financial future in San Diego's growing market.

// the plan

How a Builders Now ADU comes together

An ADU is a secondary housing unit on a single-family residential lot, sometimes called a “granny flat” or “in-law suite.” Builders Now handles the full ADU plan: Consultation → Design → Permitting → Construction. The average construction phase runs 4–8 months from break-ground to completion; planning, design, and permitting add to that timeline. Throughout the build, JobTread keeps you in the loop on every change order, schedule update, and decision.

  1. 01

    Consultation

    We start by listening. Your goals, lot, and budget get mapped against what SB9 and ADU code actually allow.

  2. 02

    Design

    Architectural drawings tuned for ADU-specific code, your usage plan, and your aesthetic.

  3. 03

    Permitting

    We handle every permit, every inspection. You stay informed in JobTread.

  4. 04

    Construction

    On-site work supervised by a Builders Now construction manager, averaging 4–8 months from break-ground to completion.

// frequently asked

ADU questions, answered

All FAQs →
How do I know if I can build an ADU on my property?
Many factors determine ADU eligibility, including zoning, lot size, and existing structures. Generally, if your property is zoned for single-family or multi-family use, you can build an ADU. The best way to confirm is to consult with our team — we can guide you through local regulations and requirements.
Can I rent out my ADU?
Yes — ADUs can be rented out, making them an excellent source of passive income. However, rental rules may vary depending on your locality. It's crucial to be aware of local regulations such as minimum rental durations and tenant rights. Our team can provide guidance on maximizing your ADU's potential within legal bounds.
How long does it take to build an ADU with Builders Now?
The duration varies based on design complexity, site conditions, and permit processing. On average, the construction phase takes 4–8 months from breaking ground to completion. It's essential to account for planning, design, and permitting, which can extend the timeline. Our proactive JobTread communication ensures you're always in the know.
What exactly is an ADU and why is it beneficial?
An ADU, or Accessory Dwelling Unit, is a secondary housing unit on a single-family residential lot. Often referred to as "granny flats" or "in-law suites," ADUs provide additional living space, which can be used for family members, rental income, or even personal uses like a home office or gym. They're beneficial because they offer flexible living arrangements and can increase the value of your property.

// pick a time

Schedule an ADU consultation

The calendar shows our live availability. Pick the slot that works for you.

// get an estimate

Get my ADU estimate

Tell us about your property and your vision. We'll come back with feasibility, ballpark pricing, and next steps, usually within one business day.

office
4438 Ingraham St., San Diego, CA 92109
Do you have design plans or blueprints?